HarborWorks Sourcing Load Checks and Acceptance Criteria

HarborWorks Sourcing is an independent sourcing partner. A load sheet is how a buyer tests an alternative building. It is not a claim that this desk engineered the structure, and it is not a channel for the searched brand.

Write the design basis you actually have: wind speed, wind exposure category, ground snow load, seismic design category, design live load, and design dead load. Unknown stays unknown. The supplier then states the assumption used in the quotation.

Send the load basis
Annotated wind, snow, and seismic notes on a building section

Order of a load review

1

Site criteria

Jurisdiction, exposure, and the code edition the authority uses.

2

Gravity and lateral

Floor live load, roof snow, and the seismic category side by side.

3

Envelope criteria

Thermal transmittance and the fire-resistance rating asked of the wall and roof.

4

Deviation log

Any substituted member, coating, or span is listed before award.

What to read on a returned sheet

Lateral and gravity
WindSpeed, exposure, and whether the figure is ultimate or allowable. A missing exposure category is an open item.
Snow and seismicGround snow load in psf and the seismic design category. Do not copy either from a neighboring county.
Frame
Primary frameRigid frame or another system, clear span, eave height, and bay spacing. Hot-rolled steel versus cold-formed steel should be named.
Secondary framingPurlin and girt spacing, and the design live load the floor or mezzanine is said to carry.
Envelope and proof
SkinInsulated metal panel or another assembly, with thermal transmittance and the fire-resistance rating if the occupancy requires one.
FileCalculations and drawings for the quoted system. ASCE 7, AISC 360, and AWS D1.1 are requests when they apply. They are not badges of this desk.

Volumetric modules move a finished box, so the transport envelope can limit the section that was analyzed. Panelized construction can match an odd plan and then spend more time in the weather. A standardized unit is easier to compare when the published size fits. A custom span needs the load criteria before the price is meaningful. Accepting an alternative means the buyer has seen those differences, not merely a lower figure.

Before the alternative is accepted

Which specification choices are still open?

Any load marked assumed, any coating not named, any foundation interface left to others, and any scope line that one factory included while another excluded it.

What should be verified before award?

That the drawing number matches the priced system, that the destination and quantity match the freight line, and that a licensed project professional accepts the design basis for that jurisdiction.

Where do shell and turnkey disagree?

They disagree wherever the crane, the anchor bolts, the interior, or the permits change hands. Keep those rows visible in the matrix even if the supplier would rather fold them into one number.

Send the criteria you have

Partial data is usable if the gaps are labeled. The desk will not fill a wind speed to make the form look finished.

  • Attach the use and the module dimensions in the same note.
  • Separate shell, delivered, installed, and turnkey.
  • State quantity, destination, and the requested delivery window.
  • Review inquiry options if the format is not chosen.